Plant engineering
A boiler room delivered with the progress report matching the hours
Industrial plant contractor · 22 people · Lombardy
Refit of a boiler room planned at 1,140 hours. The piping item was slipping: it surfaced in week three instead of at commissioning.
Week 3when the deviation surfaced